國(guó)際生產(chǎn)與運(yùn)作管理學(xué)會(huì)(Production and Operations Management Society, POMS)成員, 國(guó)際期刊International Journal of Production Research 、International Journal of Operations Research and Information Systems等的審稿專家
[1]Shuwei Wang,Xiuping Guo, An efficient hybrid artificial bee colony algorithm for disassembly line balancing problem with sequence-dependent part removal times, Engineering Optimization, 1(1):1-19,2019.
[2]Xiaofei Zhao,Xiuping Guo, An effective chemical reaction optimization for cyclic multi-type parts robotic cell scheduling problem with blocking, Journal of Intelligent & Fuzzy Systems, 2018, 35(3):3567-3579.
[3]D.L. Lei,Y.L. Zheng, X.P. Guo, A shuffled frog leaping algorithm for flexible job shop scheduling with the consideration of energy consumption, International Journal of Production Research, 55(11): 3126-3140, 2017.
[4]D.M. Lei, X.P. Guo, Variable neighborhood seaarch for the second type of two-sided assembly line balancing problem, Computers and Operations Research, 72(C) :183-188, 2016.
[5]D.M. Lei, X.P. Guo, Hybrid flow shop scheduling with not-all-machines options via local search with controlled deterioration, Computers and Operations Research, 65(C): 76-82, 2016.
[6]D.M. Lei, X.P. Guo, A parallel neighborhood search for order acceptance and scheduling in flow shop environments, International Journal of Production Economics, 165:12-18, 2015.
[7]D.M. Lei, X.P. Guo, An effective neighborhood search for scheduling in dual resource constrained interval job shop with environmental objective, International Journal of Production Economics, 159: 296-303, 2015.
[8]Xiuping Guo, Deming Lei, Bi-objective job shop scheduling with outsourcing options[J], International Journal of Production Research, 52(13), 3832–3841. 2014.
[9]Deming Lei,Xiuping Guo,Scheduling job shop with lot streaming and transportation through a modified artificial bee colony[J], International Journal of Production Research, 51(16), 4930–4941. 2013.
[10]Deming Lei, Xiuping Guo, Variable neighborhood search for minimizing tardiness objectives on flow shop with batch processing machines[J]. International Journal of Production Research, 49(2), 519-529. 2011.
[11]Deming Lei, Xiuping Guo, Swarm neighborhood based algorithm for fuzzy flexible job shop scheduling[J],International Journal of Production Research, 2012.
[12]Xiuping GUO,Genke YANG,Zhiming WU,Zhonghua HUANG,A Hybrid Fine-Tuned Multi-Objective Memetic Algorithm[J]. TRANSACTIONS on Fundamentals of Electronics, Communications and Computer Sciences, 2006,Vol.E89-A, No.3, pp.790-797.
[13]Xiuping Guo, Zhiming Wu and Genke Yang, A Hybrid Self-adjusted Memetic Algorithm for Multi-objective Optimization[J], Lecture Notes in Computer Science, 2005, Vol 3789, pp. 663 – 672.
[14]Guo Xiu Ping, Yang Gen Ke, and Wu Zhi Ming, A Hybrid Adaptive Multi-objective Memetic Algorithm for 0/1 Knapsack Problem[J], Lecture Notes in Computer Science, 2005, Vol 3809, pp. 176 – 185.
[1]Guo xiuping, Liu huahua, A RKGA for a single batch processing machine with secondary resource constraints, POMS International Conference 2014.
[2]Lei Gao,Xiuping Guo, Minimizing earliness-tardiness time on a batch processing machine with dynamic job arrivals and uncommon due dates[C]. The 2nd International Conference on Computer and Management,2012.
[3]Hou zhengliang, Guo xiuping,A Variable Neighborhood Search Approach for Multiple Resources Constrained Parallel Machine Scheduling Problem[C],2012 IEEE International Conference on Industrial Engineering and Engineering Management, 2012.
[4]Zhengliang Hou, Xiuping Guo,Parallel Machine Scheduling with Resources Constraint and Sequence Dependent Setup Times, 2012 third international asia conference on industrial enginerring and management innovation, 2012.
[5]Xiuping GUO,A Variable Neighborhood Based Memetic Algorithm for Scheduling Single Batch Processing Machine with Non-identical Job Sizes[C]. IEEE International Conference on Management Science and Information Engineering, 2010: 327-330.
[6]Deming Lei, Xiuping Guo, Solving fuzzy flexible job shop scheduling problems using genetic algorithm[C]. International Conference on Machine Learning and Cybernetics, 2008: 1014-1019,.
[7] guo xiuping,xiao qinxin, Robust optimization for profit-oriented disassembly line balancing with uncertainty, International Conference on Management and Operations Research, Beijing, 2016.
[8] zhao xiaofei,Guo Xiuping, A GA based on two new heuristics for heterogeneous parts robotic cells scheduling problem, International Conference on Management and Operations Research, Beijing, 2016.
[9] Tainli Wang(#); Xiuping Guo; Meng Song; yunfeng peng(*), A Fuzzy Synthetic Evaluation Algorithm with Dynamic Weight for SDN, 2017 IEEE 2nd Information Technology,Networking,Electronic and Automation Control Conferenc, 2017,EI.
Working papers:
[1]Disassembly line balancing under uncertainty: Robust optimization models.(in review, IJPR)
[2]A Dynamic Programming Approach to a Bi-Objective Disassembly Line Balancing Problem.(in review,AOR)
[3]multi-objective optimization problem of the microgrid power dispatch using Improved Multi-objective Evolutionary Algorithm based on Decomposition.
[4]Research on logistics scheduling optimization problem with truck-drone joint delivery.